{"id":7889,"date":"2022-04-29T14:34:49","date_gmt":"2022-04-29T12:34:49","guid":{"rendered":"https:\/\/norrlageab.se\/nyhetsflode\/noise-barrier-along-road-97\/"},"modified":"2023-05-16T13:06:41","modified_gmt":"2023-05-16T11:06:41","slug":"noise-barrier-along-road-97","status":"publish","type":"nyhetsflode","link":"https:\/\/norrlageab.se\/en\/nyhetsflode\/noise-barrier-along-road-97\/","title":{"rendered":"Noise barrier along road 97"},"content":{"rendered":"\n<p>Norrl\u00e4ge, entrusted by <a href=\"https:\/\/www.grk.fi\/se\/koncernen\/foretag\/grk-infra-ab\/\" class=\"rank-math-link\" target=\"_blank\" rel=\"noopener\">GRK Infra AB<\/a> and <a href=\"https:\/\/www.grundtuben.se\/\" class=\"rank-math-link\" target=\"_blank\" rel=\"noopener\">Grundtuben AB<\/a>, was tasked with the construction of a noise barrier along the newly developed segment of Road 97 between S\u00f6dra Sunderbyn and S\u00e4vast. <\/p>\n\n<p>&#8220;We efficiently fulfilled the project&#8217;s demand for a substantial area of noise barriers. The feedback has been exceptionally positive, with many commending the barrier&#8217;s aesthetic appeal and effectiveness,&#8221; highlights Johan Ekstr\u00f6m, one of Norrl\u00e4ge&#8217;s co-owners. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1080\" data-id=\"6583\"  src=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC07998.jpg\" alt=\"\" class=\"wp-image-6583\" srcset=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC07998.jpg 1920w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC07998-300x169.jpg 300w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC07998-1024x576.jpg 1024w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC07998-768x432.jpg 768w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC07998-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1080\" data-id=\"6585\"  src=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08008.jpg\" alt=\"\" class=\"wp-image-6585\" srcset=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08008.jpg 1920w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08008-300x169.jpg 300w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08008-1024x576.jpg 1024w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08008-768x432.jpg 768w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08008-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1080\" data-id=\"6586\"  src=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08020.jpg\" alt=\"\" class=\"wp-image-6586\" srcset=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08020.jpg 1920w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08020-300x169.jpg 300w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08020-1024x576.jpg 1024w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08020-768x432.jpg 768w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/04\/DSC08020-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/figure>\n\n<p><strong>The noise barrier construction was completed punctually and met all expectations.<\/strong><\/p>\n\n<p>This undertaking, carried out during the summer of 2021, constituted a significant project. Ordinarily, noise barriers follow stepped designs to accommodate ground slopes. However, in this instance, the Transport Administration and landscape architect opted for a barrier that seamlessly aligns with the ground level throughout, necessitating the construction of rhombus-shaped sections. This approach posed additional challenges. The Transport Authority, acting as the ultimate client, made the final decisions regarding the barrier&#8217;s color and appearance. Beyond its primary purpose of noise reduction, the barrier also serves as a safety measure.   <\/p>\n\n<p><a class=\"rank-math-link\" href=\"https:\/\/www.grundtuben.se\/\" target=\"_blank\" rel=\"noopener\">Grundtuben AB<\/a>, a company with profound expertise in foundations and fasteners for noise barriers and other structures, played a pivotal role in the project. <\/p>\n\n<p>&#8220;Norrl\u00e4ge demonstrated exemplary performance, delivering on time despite the tight schedule. We are satisfied with their valuable contribution to the project. Their professionalism and seamless collaboration made the process smooth and convenient. Additionally, the proximity of their office and factory to Road 97 proved advantageous,&#8221; expresses Anders Nilsson, project manager at Grundtuben AB.   <\/p>\n\n<p><strong>Does your company need help with its next construction project?<\/strong><br\/><a class=\"rank-math-link\" href=\"https:\/\/norrlageab.se\/kontakt\/\">Contact us<\/a> at Norrl\u00e4ge.<\/p>\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/03\/kontakt_norrlage_johan_ekstrom-1-1024x586-1.png\" alt=\"\" class=\"wp-image-5433\" width=\"383\" height=\"218\" srcset=\"https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/03\/kontakt_norrlage_johan_ekstrom-1-1024x586-1.png 1024w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/03\/kontakt_norrlage_johan_ekstrom-1-1024x586-1-300x172.png 300w, https:\/\/norrlageab.se\/wp-content\/uploads\/2022\/03\/kontakt_norrlage_johan_ekstrom-1-1024x586-1-768x440.png 768w\" sizes=\"(max-width: 383px) 100vw, 383px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the period from spring 2020 to fall 2021, the section of road spanning from S\u00f6dra Sunderbyn to S\u00e4vast underwent a transformation into a non-meeting road, aimed at enhancing traffic safety and accessibility. As a result, the entire route between Lule\u00e5 and Boden now ensures uninterrupted flow.  <\/p>\n","protected":false},"featured_media":7722,"template":"","categories":[634],"_links":{"self":[{"href":"https:\/\/norrlageab.se\/en\/wp-json\/wp\/v2\/nyhetsflode\/7889"}],"collection":[{"href":"https:\/\/norrlageab.se\/en\/wp-json\/wp\/v2\/nyhetsflode"}],"about":[{"href":"https:\/\/norrlageab.se\/en\/wp-json\/wp\/v2\/types\/nyhetsflode"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/norrlageab.se\/en\/wp-json\/wp\/v2\/media\/7722"}],"wp:attachment":[{"href":"https:\/\/norrlageab.se\/en\/wp-json\/wp\/v2\/media?parent=7889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/norrlageab.se\/en\/wp-json\/wp\/v2\/categories?post=7889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}